Tuesday, November 24, 2026SubscribeMastheadAbout
Cali ReporterCalifornia · National · West Coast · Good News

Advertisement

Transportation

Metro Freeway Expansion Projects Blocked by Committee Vote

A Metro board committee rejected $222 million in funding for three freeway widening projects in Southeast L.A. County, marking a rare shift in the agency's usual approval process for such expansions.

Portrait of Cali Reporter Transportation Writer
Transportation · November 19, 2026
Share

AI-generated editorial illustration from an imagined camera angle.
AI-generated editorial illustration from an imagined camera angle. Source image: la.streetsblog.org.

The Metro board Planning and Programming Committee failed to approve $222 million for three freeway expansion projects located in the Southeast L.A. County Gateway Cities subregion, according to Streetsblog Los Angeles (source ID 1). The projects include $139 million for adding a westbound lane on the 91 Freeway through Artesia and Cerritos, $72 million for adding four new lanes on the 91 Freeway through Compton, and $11.5 million for expanding on/off-ramps on the 405 Freeway in Pico Rivera and Whittier. These funds are intended to cover partial construction costs and serve as matching funds for state Trade Corridor Enhancement Program grants. Metro staff had initially recommended approval of all three projects, citing the urgency of securing these funds for grant applications. [1]

The rejection of the funding was due in part to the skepticism expressed by Long Beach Mayor Rex Richardson, who represents the Gateway Cities subregion. Richardson criticized Metro’s pursuit of Trade Corridor grants for freeway widening and emphasized the need to shift port cargo traffic from trucks to rail. He also highlighted the importance of multimodal infrastructure, such as walk, bike, and transit access, which are currently minimal in Metro’s freeway expansion projects (source ID 1). Richardson’s motion to delay the 605 project funds vote until January failed on a 3-1 vote, with Supervisor Lindsey Horvath voting against the expansion, and two board members absent due to other commitments. [1]

The Trade Corridor Enhancement Program, managed by the California Transportation Commission (CTC), aims to fund infrastructure improvements on federally designated trade corridors and other high-volume freight routes. The program supports goals such as improving freight throughput, reducing congestion, and enhancing safety along key transportation corridors (source ID 2). Projects are evaluated based on freight system factors, transportation system factors, community impact factors, and project readiness, with a requirement for 30% matching funds. The program is designed to promote efficient freight movement and reduce environmental and community impacts through coordinated planning and funding. [2]

The Metro board Planning and Programming Committee failed to approve $222 million for three freeway expansion projects located in the Southeast L.A. The rejection of the funding was due in part to the skepticism expressed by Long Beach Mayor Rex Richardson, who represents the Gateway Cities subregion (Streetsblog Los Angeles). The projects include $139 million for adding one more westbound lane on the 91 Freeway through the cities of Artesia and Cerritos, $72 million for adding four new lanes to the 91 Freeway through Compton, and $11.5 million for expanding the Beverly Boulevard on/off-ramps on the 405 Freeway in Pico Rivera and Whittier (Streetsblog Los Angeles). [1]

Advertisement

The funding allocations are intended to serve as matching funds for applications to the state Trade Corridor Enhancement Program, which aims to fund infrastructure improvements on federally designated trade corridors and other high-volume freight routes (Streetsblog Los Angeles). The Trade Corridor Enhancement Program, managed by the California Transportation Commission (CTC), is designed to support infrastructure improvements on federally designated trade corridors and other high-volume freight routes (catc.ca.gov). The program funds projects that increase the efficiency of freight movement, reduce impacts to surrounding communities, and improve safety by eliminating at-grade crossings (catc.ca.gov). [1] [2]

Long Beach Mayor Rex Richardson expressed skepticism about the expansion projects, emphasizing the importance of shifting port cargo traffic from trucks to rail and the need for multimodal projects that include walk, access, and bike facilities (Streetsblog Los Angeles). Richardson’s motion to delay the 605 project funds vote until January failed on a 3-1 vote, with Supervisor Horvath, who consistently opposes freeway widening projects, voting against the motion (Streetsblog Los Angeles). [1]

The Metro board Planning and Programming Committee failed to approve $222 million for three freeway expansion projects located in the Southeast L.A. County Gateway Cities subregion (Streetsblog Los Angeles). The rejection of the funding was due in part to the skepticism expressed by Long Beach Mayor Rex Richardson, who represents the Gateway Cities subregion. Metro continues to spend nearly a billion dollars annually on freeway expansion, despite Metro’s own findings that its freeway projects harm the climate more than Metro transit benefits climate (Streetsblog Los Angeles). [1]

The funding allocations are intended to serve as matching funds for applications to the state Trade Corridor Enhancement Program, which aims to fund infrastructure improvements on federally designated trade corridors and other high-volume freight routes (Streetsblog Los Angeles). The Trade Corridor Enhancement Program, managed by the California Transportation Commission (CTC), aims to fund infrastructure improvements on federally designated trade corridors and other high-volume freight routes (catc.ca.gov). [1] [2]

Advertisement

Long Beach Mayor Rex Richardson expressed skepticism about the expansion projects, emphasizing the importance of shifting port cargo traffic from trucks to rail and the need for multimodal projects that include walk, access, and bike facilities (Streetsblog Los Angeles). Richardson’s motion failed on a 3-1 vote. The committee then voted on the original three-project $222 million staff recommendation, which also failed on the same 3-1 split (Streetsblog Los Angeles). [1]

Sources

Streetsblog Los Angeles

catc.ca.gov

Prepared with AI assistance from the cited sources.

The Cali Reporter newsletter

The stories worth your time.

California, the country, and what comes next. Join our free newsletter for reporting that keeps you informed.

By joining, you agree to receive the Cali Reporter newsletter. Unsubscribe at any time. Privacy policy.

More in Transportation

Advertisement