Demolition work at Boyle Heights warehouse halted by solar array owner, Lineage alleges
Lineage, which operates the facility, accused Altus Power, the solar panel subcontractor whose rooftop equipment is suspected of potentially

Lineage, which operates the facility, accused Altus Power, the solar panel subcontractor whose rooftop equipment is suspected of potentially sparking the June 17 fire, of obstructing demolition efforts.
Original reporting: LA Times, California.
More in California
- UC Berkeley Lab Proposes New Civic Framework for California’s Next Governor
A research-driven agenda calls for institutionalizing 'co-governance' to address low public trust and lack of resident influence in state decision-making.
- Five Tax Measures on California’s Ballot Aim to Reshape State Finances
Propositions 3, 40–43 would alter income, wealth and local taxation rules—marking the highest number of tax measures on a general election ballot since 1994.
- Catalina Helicopter Crash Highlights Risks of Island Medevac Flights
A medical evacuation chopper carrying Catalina Romero, pilot, and nurse Jessica Devries crashed into the ocean shortly after takeoff, killing all three; federal investigators are assessing causes including night flying, spatial disorientation, and the island’s challenging Pebbly Beach heliport.

